Schedule for FIDEL Spitzer data releases:
Data Release 1 (DR1) - June 2007: Best-effort reductions of the FIDEL first epoch MIPS photometry-mode observations for the ECDFS at 24 and 70 microns
Data Release 2 (DR2) - September 2007: Best-effort reductions for:
Data Release 3 (DR3) - March 2008: Best-effort reductions for:
Data Release 4 (DR4) - June 2008: Version 1 reductions of all MIPS data for the ECDFS, EGS and GOODS-N, including scanning-mode data for ECDFS (including 160 microns). We will released combined images incorporating all major MIPS observations of the survey fields, including data from FIDEL, GTO, and GO programs. Basic science-grade point source catalogs will also be released.
Data Release 5 (DR5) - June 2009: Version 2 re-reductions (if appropriate) of all MIPS data for the FIDEL fields, including advanced, band-merged multiwavelength catalogs.